Advanced Construction Management: Site Operations and Multi-Project Supervision

When one construction manager supervises several sites at once, problems multiply: crews and equipment are fought over, quality and safety slip where attention is thin, and delays on one project spread to others. This programme gives senior site and project managers practical methods to control daily site operations and supervise a portfolio of projects with consistent standards.

Calendar19 - 23 September 2027LocationCairoTime5 Days
PriceUSD 4,000

Construction organisations rarely run one project at a time. Owners supervise several contractors, contractors run several sites, and the same managers, engineers, plant and specialist crews are shared between them. Site problems are often managed one by one: a late material delivery, a failed inspection, a safety incident, a subcontractor who does not show up. Without a common system, each site manager works differently, reporting is inconsistent, and senior managers learn about problems only when they have already affected cost, schedule or safety.

This programme looks at construction management at two levels: the individual site and the group of projects. It moves through five stages: organising site supervision and responsibilities, planning and controlling daily work, controlling quality and safety on site, supervising several projects with shared resources, and reporting and governing performance across the portfolio.

Built on recognised practice. The programme references PMI's standards for project, programme and portfolio management, the ISO 21502 guidance on project management and ISO 21504 on portfolio management, ISO 45001 for occupational health and safety management, ISO 9001 quality management principles applied to construction, the FIDIC contract conditions that define the engineer's and contractor's site duties, and lean construction methods such as the Last Planner System.

Decisions this programme improves. How to organise supervision responsibilities across sites; how to plan work weekly so that crews are not left waiting; which inspections and hold points to enforce; how to allocate shared resources between competing projects; when to escalate a site problem; and what a portfolio report must show so that senior managers can act early.

How it is delivered. Twenty hours across five sessions, built around one running case: a contractor or owner organisation running three building and infrastructure projects at different stages with shared managers, plant and subcontractors. Participants produce a supervision plan, a look-ahead schedule, an inspection and test plan, a resource allocation decision and a portfolio dashboard.

In-house option. For organisations, the programme can be tailored to your own project portfolio, contract forms, site procedures and reporting systems, and delivered to owner, consultant and contractor teams together.

Cairo

Cairo city
Access Elite Academy’s complete training portfolio in Cairo. As one of the region’s largest business and institutional centers, the city provides a strong setting for organizations and professionals seeking expert-led learning, with upcoming scheduled courses and other programs available on request. Cairo is one of Elite Academy’s international training destinations and gives organizations and professionals access to our complete portfolio of training programs across all disciplines. As one of the region’s largest business and institutional centers, the city offers a professional setting for focused learning. Participants can choose from upcoming scheduled courses in Cairo or request any other program from the Elite Academy portfolio to be arranged in the city, subject to scheduling and delivery requirements. Browse the upcoming schedule below or explore our training areas to identify the program that best matches your organization’s development priorities or your own professional goals.

Related Topics

Road failures such as rutting, cracking and early potholes are usually traced back to materials, compaction and acceptance decisions made during construction. This programme gives road quality leaders a practical system to plan, test, accept and document quality from subgrade to surfacing, using statistical acceptance and field data rather than judgement alone.

Location Kuala LumpurCalendar22 - 26 November 2026

The aim of this course is to provide participants with the technical knowledge and analytical skills required to review and evaluate the structural designs of roads and bridges.

Location DubaiCalendar23 - 27 November 2026

Design problems found on site cost far more to fix than problems found on the drawing board, yet many projects move from concept to construction with unclear briefs, uncoordinated disciplines and reviews that check drawings rather than decisions. This programme gives owners, consultants and design-and-build teams a structured method to manage design and review it at the right stages.

Location KuwaitCalendar29 November 03 December 2026