Advanced Project Scheduling with Primavera P6
Many Primavera P6 schedules look detailed but cannot be trusted: logic is incomplete, constraints hide the critical path and updates distort float. Such schedules fail as management tools and as evidence in claims. This programme gives experienced planners advanced P6 techniques to build, update, analyse and report schedules that owners, contractors and sponsors can rely on.
Owners and contractors invest heavily in P6, yet schedule reviews repeatedly find the same problems: open ends, excessive constraints and lags, unrealistic durations, resources that are loaded but never levelled, baselines overwritten without control, and progress updated in ways that make the critical path unreliable. The schedule is then produced for contractual compliance rather than used to manage, and becomes a weak basis for extension of time or recovery decisions.
This programme takes planners who already use P6 through the full cycle at an advanced level: enterprise structure and schedule architecture, logic and critical path integrity, resources and cost, updating and change control, and analysis and reporting. Each stage connects P6 functions to good scheduling practice and to the decisions the schedule must support.
Built on recognised practice. The programme references widely used schedule quality and scheduling practice, including the GAO Schedule Assessment Guide, the DCMA 14-point schedule assessment, AACE International recommended practices on scheduling and earned value management principles. P6 functions are taught in the context of these practices, not as isolated software features.
Decisions this programme improves. Whether a schedule is fit to be accepted as a baseline; which path is really critical and how much float can be relied on; how to update progress without distorting the critical path; when to re-baseline; how resource constraints change the finish date; and what schedule information sponsors need to act early.
How it is delivered. Twenty hours across five sessions, built around one running case: an EPC or building project scheduled in P6 from baseline through several updates, a change event and a recovery plan. Participants work in P6 or with P6 exports, run schedule quality checks and prepare a monthly schedule report.
In-house option. For organisations, the programme can be tailored to your own P6 enterprise structure, coding, templates and contract requirements, and can use your own project schedules as working material.
Who Should Attend
Objectives
Course Outline
Competencies
Riyadh

Related Topics
Many PPP and BOT projects fail long before operation starts: the business case was never tested against a public alternative, risks were transferred to parties who could not manage them, and the contract was signed without a plan to administer it for twenty or thirty years. This programme gives public and private teams a practical route from project selection to contract management and hand-back.
To equip participants with advanced skills and techniques in Agile project management, enabling them to effectively manage and deliver projects in dynamic environments while ensuring high adaptability and continuous improvement.
GIS projects often deliver software and maps but not the decisions they were funded to support: data arrives late or unfit for use, requirements shift and the system is hard to sustain after go-live. This programme gives GIS managers and project leaders a structured approach to plan, procure, deliver and sustain GIS projects, from user needs to operational handover.
