Advanced Quality Control for Building-Construction Projects
Defects in buildings are expensive to fix and damaging to reputation, yet most are designed in or built in long before handover. This programme gives quality leaders on owner, consultant and contractor teams a practical system to plan, inspect, test, record and close out quality on building projects, from quality plan to handover.
Many building projects have a quality manual and a stack of inspection forms, yet still suffer repeated defects, rejected work, delayed handover and long snag lists. The causes are familiar: quality plans copied from the last project, inspection and test plans that do not reflect the real risks, materials approved without adequate evidence, hold points released under schedule pressure, non-conformances closed without root cause, and records that cannot prove compliance at handover.
This programme follows the building from mobilisation to handover and treats quality control as a managed system rather than a set of forms. It moves through five stages: planning quality for the project, controlling materials and suppliers, controlling workmanship on site for the main trades, managing non-conformance and improvement with data, and achieving a clean handover with complete records.
Built on recognised practice. The programme references ISO 9001 quality management requirements, ISO 10005 guidance on quality plans, ISO 10006 guidance on quality management in projects, the quality management and compliance verification provisions of the FIDIC 2017 contracts, and widely used concrete and construction standards such as ACI 318, ACI 301, BS EN 206 and BS EN 13670. Information management with BIM is discussed with reference to ISO 19650. Participants are expected to apply the codes and specifications that govern their own projects.
Decisions this programme improves. Which activities need hold and witness points; what evidence is enough to approve a material or subcontractor; when to reject work and when to accept a concession; how to classify and escalate non-conformances; which quality indicators the project director should review each month; and whether the building is ready for handover.
How it is delivered. Twenty hours across five sessions, built around one running case: a multi-storey mixed-use building moving from quality plan through concrete frame, envelope and MEP installation to testing, commissioning and handover. Participants draft inspection and test plans, review material submittals and test results, analyse non-conformance data and prepare a handover readiness checklist.
In-house option. For organisations, the programme can be tailored to your own specifications, inspection forms, quality software and typical building types, and delivered to owner, consultant and contractor teams together so that all parties apply the same acceptance rules.
Who Should Attend
Objectives
Course Outline
Competencies
Dubai

Related Topics
This course aims to provide construction project managers, contract administrators, and financial analysts with comprehensive knowledge and practical skills for managing variation orders effectively, ensuring financial stability and contractual compliance throughout the construction process.
Design problems found on site cost far more to fix than problems found on the drawing board, yet many projects move from concept to construction with unclear briefs, uncoordinated disciplines and reviews that check drawings rather than decisions. This programme gives owners, consultants and design-and-build teams a structured method to manage design and review it at the right stages.
A laboratory can hold accreditation and still issue results it cannot fully defend, because method validation, measurement uncertainty, traceability and result monitoring are treated as documents rather than technical controls. This programme gives technical and quality managers a practical way to manage the technical requirements of ISO/IEC 17025 and to run a laboratory whose results are valid and trusted.