Facilities Management for Construction
Many buildings and infrastructure assets start their operating life with missing records, systems that are hard to maintain and costs nobody planned for, because facilities management was not involved during design and construction. This programme shows how to bring FM thinking into projects early, manage handover properly and set up the asset for efficient, safe operation.
The operating phase of a building costs far more over its life than its construction, yet most decisions that drive those costs are made before the FM team arrives. Plant rooms without access for maintenance, specified equipment with no local support, commissioning compressed at the end of the programme, operation and maintenance manuals delivered late and incomplete, and asset data that does not match what was installed: these problems are common and expensive to fix after handover.
This programme follows the asset from brief to stable operation. It starts with FM principles and the business case for early involvement, then covers operability and maintainability reviews in design, commissioning and handover, asset information and digital handover, and finally mobilising FM services and the first year of operation.
Built on recognised practice. The programme references ISO 41001:2018 on facility management systems and ISO 41011:2024 vocabulary, ISO 55001:2024 on asset management, ISO 19650-3 for information management in the operational phase, the Soft Landings framework for design, handover and aftercare, ISO 15686-5 on life-cycle costing and the RICS NRM 3 approach to maintenance cost planning. Participants learn how to use them on real projects.
Decisions this programme improves. When and how to involve FM in a project; which design features to challenge for operability and maintainability; what asset information to specify and when; whether a building is ready to be accepted; how to structure FM service contracts and mobilisation; and how to handle defects and aftercare in the first year.
How it is delivered. Twenty hours across five sessions, built around one running case: a new public building moving from detailed design through construction to handover. Participants review design drawings for maintainability, draft asset information requirements, prepare a handover readiness checklist and a mobilisation plan, and estimate life-cycle maintenance costs with a spreadsheet model.
In-house option. For organisations, the programme can be tailored to your own project delivery process, FM contracts, asset registers and digital systems, and delivered to project, FM and asset management teams together so that handover becomes a shared responsibility.
Who Should Attend
Objectives
Course Outline
Competencies
Vienna
Related Topics
Water leaks, air leakage, condensation and failed sealants are among the most common and costly defects in new buildings, and they are usually found only after handover. This programme gives engineers, inspectors and facility teams a practical method to inspect the building envelope, plan and witness field tests, interpret results and close out defects before they become claims.
Construction decisions are often made on technical reports that are hard to read, weakly evidenced or answer a different question from the one being asked. This programme gives engineers, project managers and client representatives a structured method to evaluate technical reports critically and to write reports that lead decision makers to a clear, defensible conclusion.
Green building ratings are increasingly required by owners, authorities and investors, yet many projects treat them as a documentation exercise added late in design, which raises cost and weakens results. This programme explains the Global Sustainability Assessment System (GSAS), how its assessment categories and schemes work, and how to plan projects that meet their target rating efficiently.
