Legal and Contractual Principles for Evaluating EOT and Cost Claims

Extension of time and cost claims are often won or lost on paper long before any dispute: on notices, records and the logic linking events to delay and cost. This programme gives employers, engineers and contractors a structured way to evaluate EOT and cost claims against the contract, the governing law and recognised delay analysis practice.

Calendar08 - 12 November 2026LocationKuwaitTime5 Days
PriceUSD 4,300

Few construction projects finish on time, and most delays lead to claims. Evaluating them is difficult. Notices are late or incomplete, programmes are not updated, records are missing, and claims mix entitlement, delay and quantum in a single document. Employers and engineers may reject valid claims or accept weak ones because they lack a consistent method, while contractors submit claims that fail on procedure rather than merit. The outcome is delayed payment, strained relationships and disputes that could have been avoided.

This programme follows the logic of a sound evaluation. It starts with the contractual and legal framework, moves to notices, time bars and records, then to establishing entitlement and analysing delay, then to evaluating the associated costs, and finally to determination, negotiation and dispute avoidance. The focus is on the questions an evaluator must answer and the evidence needed at each step.

Built on recognised practice. The programme references the FIDIC 2017 Red and Yellow Books, including the extension of time and claims provisions, the NEC4 compensation event mechanism, the Society of Construction Law Delay and Disruption Protocol (2nd edition), AACE International Recommended Practice 29R-03 on forensic schedule analysis, and general legal principles such as the prevention principle, concurrent delay and good faith, as they apply in common law and civil law systems, including those in the GCC.

Decisions this programme improves. Whether a claim satisfies the contractual notice and substantiation requirements; whether the event is at the employer's or the contractor's risk; which delay analysis method is suitable for the records available; how to deal with concurrent delay; which cost heads are recoverable; and when to settle, determine or refer a claim.

How it is delivered. Twenty hours across five sessions, built around one running case: an infrastructure contract with late access, design changes and a contractor claim for time and money. Participants review notices and records, test the entitlement argument, compare delay analysis results and evaluate quantum, before preparing a reasoned determination.

In-house option. For organisations, the programme can be tailored to your own contract forms, particular conditions, claims procedures and governing law, and delivered to project, contracts, commercial and legal teams together.

Kuwait

Train in Kuwait City with access to Elite Academy’s full portfolio of professional programs. In a city known as a key Gulf business and government center with an established professional environment, organizations and professionals can join upcoming courses or request any program to be arranged locally. Professional training in Kuwait City is not limited to a specific group of subjects. Elite Academy makes its complete portfolio available in the city across management, business, technical and industry-focused disciplines. With a key Gulf business and government center with an established professional environment, Kuwait City provides an effective setting for international learning. Use the schedule below to view courses already planned for the destination, or contact our team to request another program and preferred dates in Kuwait City, subject to scheduling and delivery requirements.

Related Topics

Design problems found on site cost far more to fix than problems found on the drawing board, yet many projects move from concept to construction with unclear briefs, uncoordinated disciplines and reviews that check drawings rather than decisions. This programme gives owners, consultants and design-and-build teams a structured method to manage design and review it at the right stages.

Location RomeCalendar25 - 29 October 2026

To equip legal professionals with advanced legal, contractual, and procedural knowledge in managing, evaluating, and resolving construction claims—focusing on contract law, claims drafting, dispute avoidance, and resolution in accordance with legal standards and construction best practices.

Location DubaiCalendar26 - 30 October 2026

Road failures such as rutting, cracking and early potholes are usually traced back to materials, compaction and acceptance decisions made during construction. This programme gives road quality leaders a practical system to plan, test, accept and document quality from subgrade to surfacing, using statistical acceptance and field data rather than judgement alone.

Location ViennaCalendar01 - 05 November 2026