Smart Design Management
Design problems discovered on site are the most expensive to fix: late changes, poor coordination and unclear briefs turn into variations, delays and claims. This programme gives project and design managers a structured way to manage design from the brief to construction information, using stage gates, digital coordination and disciplined review so that designs are complete, buildable and within budget.
On many capital projects, design is treated as something consultants do rather than something the project manages. The client brief is incomplete or keeps changing, design stages overlap without clear deliverables, disciplines work in isolation, and reviews focus on appearance rather than cost, buildability and operation. Information arrives late or uncoordinated, and the gaps become requests for information, variations and delay on site.
This programme treats design management as a controlled process. It follows the design life cycle: setting a clear brief and design responsibilities, planning and programming design deliverables stage by stage, coordinating disciplines and information through digital tools, reviewing and approving design against cost, quality and performance requirements, and managing change and handover into procurement and construction.
Built on recognised practice. The programme references the ISO 19650 series on information management using building information modelling, the RIBA Plan of Work as a stage framework, the design and development requirements of ISO 9001, and the design responsibility provisions typically found in FIDIC and other standard forms of contract. Participants learn how to apply these as practical tools on their own projects.
Decisions this programme improves. Whether a brief is mature enough to start design; how to allocate design responsibility between consultants, contractors and specialists; whether a design stage is complete enough to pass a gate; when to freeze design and how to control late change; how much design to transfer to contractors; and what information the owner needs for operation and maintenance.
How it is delivered. Twenty hours across five sessions, built around one running case: a mixed-use building project moving from brief through concept, developed and technical design. Participants test a brief, build a design responsibility matrix and deliverables schedule, run a design review, assess a late design change and plan the information handover.
In-house option. For organisations, the programme can be tailored to your own stage-gate process, consultant appointments, BIM requirements and review templates, and delivered to owner, consultant and contractor teams together.
Who Should Attend
Objectives
Course Outline
Competencies
Dubai
Related Topics
Water leaks, air leakage, condensation and failed sealants are among the most common and costly defects in new buildings, and they are usually found only after handover. This programme gives engineers, inspectors and facility teams a practical method to inspect the building envelope, plan and witness field tests, interpret results and close out defects before they become claims.
Construction decisions are often made on technical reports that are hard to read, weakly evidenced or answer a different question from the one being asked. This programme gives engineers, project managers and client representatives a structured method to evaluate technical reports critically and to write reports that lead decision makers to a clear, defensible conclusion.
Many buildings and infrastructure assets start their operating life with missing records, systems that are hard to maintain and costs nobody planned for, because facilities management was not involved during design and construction. This programme shows how to bring FM thinking into projects early, manage handover properly and set up the asset for efficient, safe operation.